Single project lead, unified milestone schedule, one engagement letter.
Discuss this bundle →P1 Financing · P2 Ready-to-Build · P3 EPC · P4 Operations. Each domain combinable per mandate. Scope is signed by VerdeVolt Proiect S.R.L. before any fee is invoiced.
Bank debt, DFI co-financing and EU funds — sourced and structured for Romanian PV and BESS, from term sheet to drawdown.
We run the bank-side and DFI-side processes in parallel, not sequentially. A typical 50–150 MWp stack combines a senior tranche from a Tier-1 Romanian bank, a co-financing tranche from EBRD or EIB where the ESG profile fits, and grant capital for the BESS component from the Modernisation Fund or AFM.
Success-fee structures vary by region — disclosed in the engagement letter
Book a 30-minute free call →
RTB pipelines sourced with BESS co-located by default, structured to pass DFI and Tier-1 bank due diligence.
Pure-PV projects in Romania now face curtailment risk and miss the CfD-3 economic window; co-location is the new baseline. Origination is concentrated in five clusters — Bărăgan, Moldova, Oltenia, Transylvania South, Black Sea East — where grid headroom, land cost and permitting velocity converge. Indicative MWp ranges per cluster are disclosed under NDA.
Region-specific success-fee structures — TR, EU, Gulf — disclosed in the engagement letter
See ready-to-build approach →
Electrical design under VerdeVolt's ANRE D1 attestation 21749/2024. Full EPC coordination through partner network, or independent owner's engineering on your side.
The D1 attestation covers electrical line design at all standardized voltages — the gating credential for grid-tied PV and BESS in Romania. Where investors hold their own EPC contract, we sit on the owner's side: deliverables, claims, variations, commissioning. We do not double-mandate.
Post-COD coordination over the 25-year revenue period — O&M, asset management, trading and lender reporting.
Returns after commercial operation date are a function of uptime, balancing-market discipline, and lender-covenant compliance. Our local representation includes board service and regulatory liaison — useful where the investor sits outside Romania and needs a Cluj-based counterparty for ANRE, Transelectrica and the financing bank.
Investors entering Romania for the first time rarely need only one product. A typical mandate combines Ready-to-Build sourcing with Financing facilitation, or EPC coordination with Operations. Each bundle ships under a single engagement letter.
Single project lead, unified milestone schedule, one engagement letter.
Discuss this bundle →
One senior lead across financing, RTB sourcing, and EPC design. Quarterly committee reporting included.
Discuss this bundle →
Dedicated investor representation. Quarterly board updates. Reference call available on request.
Discuss this bundle →Final scope, price, currency, milestone schedule and governing law are confirmed in writing in the engagement letter — signed by VerdeVolt Proiect S.R.L., before any drawdown of fees.
Corporate KYC, UBO disclosure, source-of-funds, sanctions screening — before any LOI.
No project, partner or counterparty name is shared without a signed mutual NDA.
We do not guarantee transaction closing, financing approval, grant award, permit issuance or project success.
Service fees are not blanket 100% deductible — we recommend client-side fiscal advice for every engagement.
We do not represent both buy-side and sell-side on the same Romanian project without written disclosure to both parties and a written waiver.
A 30-minute call is free. We let you describe the mandate before we describe ourselves, then propose the right engagement.